CareersManual AccessStore
News | Blog

Mepaco Blog


Reliable by Design


7 Parts to Consider for Holiday Shutdown

Holiday-Blog-Post.jpg

Here's a quick infographic and guide with 7 common parts in food processing equipment that should be in stock for year-end / holiday shut-down maintenance.

EMERGENCY

1. Motors: Extra motors can prevent unnecessary emergency shut-downs and lost production.

LONG LEAD TIME

2. Agitators: Agitators are custom fabricated to your machine specification, and require longer lead time than typical parts.

3. Cylinders: Make sure you have cylinder back-ups, which can also have  long lead times.

RECOMMENDED SPARES

4. Safety Switches: Keep extra safety switches in inventory to reduce downtime.

5. Bearings: Mepaco's recommendation for bearings is 1 or 2 back-ups. Check to see if the bearing is a common stock item; if it is not common, plan for longer lead times.

PREVENTATIVE MAINTENANCE

6. Shaft Seals: Plan on 2 - 3 seals per shaft, depending on usage.

7. Gaskets: Gaskets are usually sold in bulk by the foot, check your inventory to make sure you have an ample supply.

 

If you want to review your parts needs, contact Monica Planasch, Mepaco's Parts Manager, at monica.planasch@apachestainless.com.  

 

 

 




Comments are closed.


Subscribe To Our Blog

Enter your email address to subscribe to this blog and receive notifications of new posts by email.

    Recent Posts

    Read More »